View Topic Comments

Crude unit overhead corrosion monitoring & mitigation

Query Raised By: Sudhir A, Manager, HPCL

Sir, wish to know industry best practices on corrosion monitoring and mitigating measures in Crude unit overhead circuits. Following info is being sought: 1) Corrosion monitoring parameters with limits 2) Allowable & actual corrosion rate in overhead circuits 3) mitigating measures being adopted

(1)  Comments

  • Subramoni Iyer M.R., CGM (Tech.), BPCL-Kochi(Expert)   -   27-Jul,2019 12:03

    • Corrosion rate limit is 5 mpy or 0.125 mm/year. • Normal limits for overhead Boot water: Iron <1 ppm; chlorides <25 ppm (Max: 30 ppm) • Detailed corrosion mechanism & control methodologies are available in NACE document (Crude Distillation Unit—Distillation Tower Overhead System Corrosion, December 2009, NACE International)